Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A long transmission line is limited by -
a)thermal limited
b)voltage limited
c)stability limited
d) L,C limited
please explain with proper reason.

Answer Posted / k.prakashchandra

Voltage limited as the voltage regulation should be within
limits.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In EHV transmission line a neutral grounding reactor is often placed at neutral point of shunt reactors. What is the recommended protection for this neutral grounding reactor? Should I use a fast closing switch to bypass neutral grounding reactor when this protection operates?

3247


why Y CONNECTION IS BETTER INTERMS OF EFFICIENCY AND P.F FOR A LAOD LESS THAN 40% AND WHY AFTER DELTA IS BETTER FOR > 40%

1955


From reading, Under voltage relay used also as phase sequence relay now, Why I use under voltage and phase sequence relay in the same circuit (ATS)?

1790


how can i get the formula to find out the cable size if i know the load of main fuse protection.

1941


how 650 volts creates? where is use?

2217


If a high resistance fault occurs,then what are the changes will happen in the system?

1471


sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company

2278


What will be the diameter of pipe between conservation tank and transformer

1938


What are the factors influence the choice of an electrc drive?

2085


How to select the gauge of wire for winding of motors? How to select number of turns for winding of three phase induction motor?

2746


We have 250 KW x 2 motors, which are load from 25% to 100% varying load in every minute , so how can we compansate the power factor. pl give your opinions on the above subject.

1875


what is difference between 5A and 100A CT constructional wise and operation?

3574


How many VSC based HVDC are there in India and the world

2241


How can two 3 phase transformers of same KVA and Voltage be connected in parallel?

1902


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1806