Answer Posted / hari om
first of all stress:
It is the internal resistance of a body against external
forces.
Now Tensile Stress:
Simply it is the internal resistance of a body against any
external force in TENSION(Any force which tries to pull the
body to elongate it along its length)
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
What is a bearing? What are the different types of bearings?
Explain the principle of Suizer Fuel oil injection pump
sir,i am golng to attend BHEL supervisor trainee personal interview on 11 sept.anyone share me that how could i perform well in interview& what they would expect from me. thank you.
Which pipe should I use SAW, ERW or seamless if I have the following constraints I have to transport methane gas Size is 8” Corrosive environment Sulphide is present Also tell the cost comparison
how buoyancy force is realte with convection?
What is the use of white metal?
how can u increase the efficiency of a power plant without changing the effort?
What do you understand by critical points in iron, iron-carbide diagram ?
What is ps?
• How can you justify it?
How many cylonders are there in 2stroke diesel engine?
HOW TO CALCULTE THE TR CAPACITY FOR SCREW COMPRESSOR, RECIPROCATING COMPRESSOR,PHE & COOLING TOWER? HOW TO CALCULATE THE FLOW RATING OF PUMPS?
DURING STEAM BLOWING OF PIPE LINE, A BLUISH COLOR CONICAL PATTERN IS OBSERVED AT THE END OF PIPE. WHATS THE CONCEPT BEHIND IT?
Why do you need a keyway in the construction of a wall?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb