what is the advantage and disadvantage of using stone dust
as a fine aggregate in concrete?????????
Answer Posted / mahendra mohan srivastava
If stone dust is full of fine partical then the w/c will
increse and the demand of cement will also increase, it is
disadvantage and advantage is you can use as a filler with
fine aggregate it will reduse your cost.
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
How many pyramid in egypt?
What is the difference between Fe 500, Fe 500 D and Fe 515.
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What glue is least sticky?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
What is the tensile strength of marble?
what is the weight of 12mm aggregates?
How to do base isolation for RC framed structure using ETABS software?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is anchorage length,lap length and (dont remember the last one)
Define aligned dimension?
What are the alternate material for steel, Sand and aggregate