Cost control in civil construction as well as Quality control
Answer Posted / d. karthick
Safety First, Quality Best, Progress Must. If we follow the
above wards, we can able to complete the Project on Time.
During the Project we can not control the cost of concrete,
steel and other Project material (Only thing we can control
the wastage). But we can control the Overhead Cost for P&M,
Staff salary and other temp. works by completing the
project before the dead line
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
what is kribs is supporting?
trapozidal
What is the use of offset command?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
How to make a c++ program that converts any base to base 10?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
Explain what is structural frames or systems?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
what is thumb rule for calculating the size of ISMB required for a particular length of span
what is idealized curve for concrere and steel
which steel is better for residential building tmt steel or hysd steel
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?