Cost control in civil construction as well as Quality control
Answer Posted / d. karthick
Safety First, Quality Best, Progress Must. If we follow the
above wards, we can able to complete the Project on Time.
During the Project we can not control the cost of concrete,
steel and other Project material (Only thing we can control
the wastage). But we can control the Overhead Cost for P&M,
Staff salary and other temp. works by completing the
project before the dead line
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
cause of cylinder test failure
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
What is an ice dam sock?
What is the general specifications of a bituminous pavement road?
what are the layers of the national and heir aprox thickness??
How many pyramid in egypt?
Why should appointment store person for project ? what is the benefits for company ?
Who designed the city of washington dc?
Define What is made from large rocks, which protects the base of cliffs?
Gidc technical que paper
How many Sft of Level Plaster per Kg
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area