Answer Posted / husen
main reson is reduce the cost of r.c.c and its use is
limte up to 20% by weight of the cemnt.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
what is the use in canals of longitudinal drains and cross drains in lining areas?
how gradation of aggregates effect on slump of fresh concrete?
What is the standard volume of pharma in cub ft
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
difference between trapezoidal and pedestal footing and how the load acts on that
how to design and calculate materail quantity for concrete speedbreaker ?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
roll of DLC in road constructions
Process of pcc in wateredug
how to calculate the steel in 500yard
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
Define What is a projection line?
what is mc arther pile?