Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why do not use fly ash bricks for waterproofing.

Answer Posted / himanshu sekhar pradhan

We canot use flyash bricks in water proofing work because
basically fly ash is a inert material. so it will not carry
any shape without mixing with cement. secondly if we let
use some pecentage of cement with fly as to make bricks,
Then such bricks will be totaly impermeable that means it's
absorption capacity will be too less then it will not
absorbed the imerse water. Then the unfortunately imerse
water instead of absorbed by bricks it will reach to
concrete layer, which may create sepage.

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2148


Explain soil analysis?

1276


How to make tiles floor step by step procedure?

2023


Define What are the reasons for geotechnical site investigations in Uganda?

1213


how to calculate the concrete mix m30 by volume

1612


How is the leaning tower of pisa supported?

1121


How to testing voids of filled aggregate in bitumen mix design

1968


what is the water-cement ratio of mix design while 30mpa in 7 days?

3106


how many shuttering material required for 1000 sq.m built up area.

2438


How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight

2006


What are the alternate material for steel, Sand and aggregate

2421


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3763


which method is used in semi-rigid connection design??

2323


rate analysis for cement pointing 1:4 , for 100 sq m

4229


Difference between pre-tensioning and post-tensioning.

1222