Answer Posted / joy
shuttering means form work for concreting , and centering means proper positioning of reinforcement with shuttering.
| Is This Answer Correct ? | 24 Yes | 15 No |
Post New Answer View All Answers
what discoveries did you have in relation to your course?
what r the precaution for high in atp tempareture,low in atp tempareture
Which is the direction of negative angle?
Define What are the reasons for geotechnical site investigations in Uganda?
how much repeitation for conventional and maivan formwork?
reinforcement slab, beam and column formulas?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
how many shuttering material required for 1000 sq.m built up area.
How will you reduce the concrete flow after mixing the concrete
1m square 20mm plastering how much of water need curing work
how to calculate the chair reinforcement length in slabs, footing or anywhere??
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
Detection of a beam & a girder areββββ
what is the maximum number of course that can be laid according to IS code and the max height.
why we are using stub column..? is it possible to construct steel stub column..?