Answer Posted / joy
shuttering means form work for concreting , and centering means proper positioning of reinforcement with shuttering.
| Is This Answer Correct ? | 24 Yes | 15 No |
Post New Answer View All Answers
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
I am called for interview from north east power plant .so, I need some interview question which may help me.
Test procedure of fly ash bricks as per code ?
Why the finite element method is lower bound solution?
How to find CN by using arcgis 9.3?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
how to calculate the scour depth
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What is the tensile strength of wood?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
The portion of a brick cut across the width is called?
how we calculate the vol.of wet concrete..?