What are the types of Road in India?
Answer Posted / b.ramakrishnan
state highway
national highway
village roads
city traffic roads
Is This Answer Correct ? | 25 Yes | 20 No |
Post New Answer View All Answers
How much cum. Brick work can do by 1 madon
The 4 main factors to start a construction project are––
what is the minimum cement content for M20 & M25 as per is code -456(2000).
dialation means
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
What are the phases inspections are done by local authority while construction?
what is the formula for Mass of cement grout (Dg)=???
strength vs shape factor
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
What do you mean by the word 'shear'?
Material calculation of cm 1:6 for 1sqm
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
explain five benefits of using standard terminology in the measurement process?