Answer Posted / suresh
2400kg/M3 for conc and 200kg/M3 for the water. Total 2600
kg/M3
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
how gradation of aggregates effect on slump of fresh concrete?
Describe the sections included in a typical bill of quantities
what is the mode of method of face bar measurement
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
what is w/c ratio in dry lean concrete for m10 mix design
what is the difference between np2 and np3 concrete mix
What is labor and material payment bond?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
what is the difference b/w full length and cutting length?
What is progress payment?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
how water proof chemicals act in concrete to avoid leek?
HOw much % of premium on DSR-2013 currently