Answer Posted / pramod kumar, gurgaon
formation of cement paste at the surface of the casted slab
or road after worked up with the trovel. it is due to the
aggregate goes down and water comes up to the top surface
which produces dust in summer and mud in rainy season.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Which is the direction of negative angle?
Why the statue of liberty is made of copper?
on what basis the partial factor of safety are decided? form the load combinations
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
How much time Required for PPR pipe network testing
how to calculate quantity of bricks in circular manhole with examples.
may i know the detailed description of cutting length
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
how do you stabilize a waterlogged area in road construction
What is OSHA compliance?
What is the use of mirror command?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is Short bored pile foundation.
What is portland cement
What is the average density of soil?