what is steel consumption for high rise building column,
beam, slab,footing

Answer Posted / s.k.roy

Based on experience the Consuption for a Building of 10-15
Storey :
Beams 125-140 Kg per cu.m of Concrete
Slabs 80-100 Kg per cu.m of Concrete
Columns 350-400 kg per cu.m of concrete
Footings100-125 Kg per cu.m
In general for a Eartquake Resistant Str in Zone 3/4 the
steel consumption can vary between 6.5 to 7.5 Kg per
sq.feet of Constructed area

Is This Answer Correct ?    29 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the outturn of Ceiling plastering

2853


what are the types of design? which type of method is used at what type of design & why?

1792


what is the type of earthing

1770


Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000

1225


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

1864






How to calculate plastering for elevated water storage tank

820


qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

1754


important question on stones

1516


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

1743


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

1614


what are the Task work of different labour.?

2156


What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

1849


for pretensioning which will yield first and same for post tensioning?

1711


Aptitude, reasoning, quants, verbal and technical question

988


Why are the bolts that hold steel rails together in oval holes?

699