In any system there are phase and neutral, where phase is
live while neutral is refrence wire. And this refrence wire
can be used to make the path availiable for returning
current.While its not necessary that this neutral may be at
zero potential(in case of faults).
But the ground is refrence with zero potential, in our
systems to increase capacity and fault current protection
Neutral point is grounded, this aslo prevents shock,
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
a)In a 3-phase 4-wire circuit, a circuit breaker is selected to protect the circuit whose highest fault level is 6.6 MVA. Determine the required minimum breaking capacity in kA. (Note: Covert 3-phase power in terms of kA to find answer.) b)Using the below, determine the required minimum making capacity in kA as a “peak value”. Rate breaking capacity (Icn) ka: Icn<= 1.5 Factor = 1.41 1.5
What can you contribute to the progress of our Company as an employee if you are selected?
why there using acb enclosure in big buildings
What is the loss of power of transformer 220kv/33kv,63/80mva of % imp12.05 at 80%load
what is p.s impedance measurement test in earthing transformer?
in wind mill use 2100 kw asychronous generator ( induction generator ) rotor voltage : 3300,stator voltage : 690, rpm : 1511 type : MRL063E04 ' we check rotor resistance magger value found following. R-EARTH - 00 M.OHM,Y-EARTH-34 M.OHM,B-EARTH- 33M.OHM R-Y: 31 M.OHM, Y-B: 00 M.OHM,B-R :33 M.OHM HOW CAN I TAKE DECISION?pls ans. quickly
how can we design robots
How to perform a DC resistance test In Alternator and their proceduces?
State the formula for overall efficiency of thermal power station
How many types of probe used in cro?
Brief working principle of stabilizer,application & safety precautions
I am EEE student i want to improve my core side skills.how cn i approach it?
why induction motors are rated at 0.8 power factor.
we have 15 ampere variyac but we want 30 ampere variyac what we do
What is the types of HT motor testing