Answer Posted / itishree mohanty
here is the formula:
(cubic feet) = (square feet) × (height in feet)
Or for meters:
(cubic meters) = (square meters) × (height in meters)
| Is This Answer Correct ? | 6 Yes | 10 No |
Post New Answer View All Answers
How does siphoning work?
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
What are the advantages of building a dam on the river nile?
how can we construct building without foundation providing only grade beam at ground level
how many type of admixtures for water stored structure?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
What is meant by cartesian coordinate system?
How to calculate paint drums per meter square
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
water leak detection system question & answer
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what is the mode of method of face bar measurement