Answer Posted / itishree mohanty
here is the formula:
(cubic feet) = (square feet) × (height in feet)
Or for meters:
(cubic meters) = (square meters) × (height in meters)
| Is This Answer Correct ? | 6 Yes | 10 No |
Post New Answer View All Answers
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
What is meant by dimensioning?
How to calculate 1 brss for RCC work
Consumption of Binding wire for fixing of cover block in vertical surface
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How is make concrete cube?
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
trapozidal
a butt weld is specified by
Forces in a Shear Wall are in plane or out of plane ?
what is flashing?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?