IN A DY11 GROUP DISTRIBUTION TRANSFORMER WITH NEUTRAL
EARTHED, WHAT WILL HAPPEN TO THE SYSTEM VOLTAGE & THE
EQUIPMENTS IF EARTH GETS OPEN ON LOAD?

Answer Posted / murtaza

three phase supply will not affect so three phase
appliances willn not affect for running but single phase
appilances will not because these appliances are not
getting proper voltage or required voltage

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Anybody tell me about modbus hex address of l&t trivector meter er300p??I want to read voltage,current,kwh etc via rs485...If anybody have a manual then send on my mail..Brijeshmodi18@gmail.Com

1983


hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible

1913


sir, I am from EEE branch.On feb 17 iam going to write an Exam for hindustan petrolium corporation Ltd.So plz send me the written exam pattern/Q's/interview questions.please mail to eee_dharmendra@yahoo.com

1933


if any body have question paper of railway (section engineering),then plz send me .i will thank of him/her.

2067


i want bhel placement paper for electrical if anybody having pl send to my id kavitha867@myway.com immediately

2065


What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?

2042


Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason

2024


hi this is hema, r there any books in particular for the preparation of the APPSC-A.E.E(electrical), if so please mail me the names ... thank u .

2001


DRAW ACIRCUIT DIAGRAM OF 100 KVA 415V/55-0-55V DELTA TO STAR TRANSFORMER

2124


pls,send the previous year written test questions.

1990


why and how voltage sharing in transformer, during magnetic balance test ?

2440


sir& friends i want the collection of recent quetions asked in interview of top most companies please send me on my email san.jsr@hotmail.com

1882


hai friends i have BSNL JTO exam on next month so if any body have model question paper or give preparation tips to my mail id kumar4486@yahoo.co.in this will helpfull for my future .plz & thank u by kumar

2074


hi this is hema can anyone mail me previous years questions for the APPSC-A.E.E (in electrical stream.) ......thank u.

1994


A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.

1189