Answer Posted / pichandi saravanakumar
Keep on try never get tired and upset. Just try one day
definitely you get chance.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
what is total volume of ingredients used in concrete accordingly
RR masonry rate analysis
What is an ortho mode?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the relation between pitch of steel and depth of slab?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What is the cost difference between site mix and ready mix concrete per cubic meter
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
What is the difference between absorption & adsorption and sorption?
IS code for grade of concrete for bamboo lintel????
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
what does the track parameter mean in staad.pro?
What is need for setting limits?