how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)
What is the importance of counter based plan & how is it scheduled?
ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????
sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan
What is the bundle conductor?
We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.
Why field rheostat is kept in minimum position while armature rheostat at maximum position?
1. What is maximum permissible distance between smoke detectors ? 2. How do we decide number of smoke detectors required in a large office, warehouse, hall etc ? 3. What should be maximum height of smoke detectors ? 4. Where do we use heat detector, optical smoke detector, temperature sensitive detector ?
how can we say that stator magnetic field rotates with synchronous speed?can we derive?
Differentiate between induced emf and self inductance?
excitation limit of an excitor
I need a formula to calculate the size of cable as per load but in the terms of length. Please Reply me as i search lot of sites but i did not get the answer.
WHAT IS THE WINDING PROCEDURE OF ELECTRICAL MOTOR
in dc shunt motor if field winding is shorted then
some basic standard questions on transformer.