pointing raju,ayesha says"he is the son of my mother's
brother's wife". how is ayesha related to raju?
Answer Posted / rajesh singh
ayesha is cuisen sister of raju
Is This Answer Correct ? | 27 Yes | 1 No |
Post New Answer View All Answers
why are you joining in this (applied post) job and your aim for this job
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
What is zoning permit?
what is the painting co efficient of slope roof tiles?
Basic questions of civil engineering
Concrete cover for slab, column, beam and footing?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
how meny typs of renging rod?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.