Answer Posted / reethesh.m.p.
2400kg/m3
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
how to convert sand in Cft to Kgs
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
I need model question papers for writing the Dubai municipality exam,for G+1
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
What is construction mitigation management?
How will you reduce the concrete flow after mixing the concrete
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
What is the use of array command?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
What are the RISKS during the project construction?
What is the difference between chamfer and fillet?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
How to testing voids of filled aggregate in bitumen mix design
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.