Answer Posted / reethesh.m.p.
2400kg/m3
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Permissible wastage of cement as per IS code ? In which IS code I get it?
What is the difference between Hinged and pinned in Column ends
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
All aptitude question of Bechtel
Explain the Strength of brick?
what are the duties of Site Engineer in work site?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
How do you maintain water pressure?
door and window wood work calculations and different methods
What is the different type of slump test indications?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
115mm thickness brick work how to required mortar
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
How to calculate brick work quantity?? Block work quantity??