Answer Posted / k.prakashchandra
connect it in the higher voltage side for SC test and in the
primary for OC test.
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
WHY TERTIARY OF POWER TRANSFORMERS IS LOADED WITH EQUIPMENTS LIKE CT,PT,ISOLATOR AND CB
What do you mean by screen of power cables?
what is basic difference betmeen normal & flame proof motor??
what are the accessories need to be added while doing estimation for the following: 1.MCCB 2.MCB 3.ACB
How to work E.L.C.B and how to connect in circuit.
What are the different types of controllers?
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
What is resonant peak?
On Which Pressure PRV is operated.
Explain The Application Of Storage Batteries?
concept of busbar and load dispatching..?
Who are the manufacturer for Nitrogen based Fire Protectio/explosion prevention for Oil Filled Transformers? India and international both?
block diagram of 2 ups system connected in parallel mode?
why there using acb enclosure in big buildings
The power supplied to a 50mH inductor from a 120V, 60Hz source will be