Answer Posted / phanisaladi
Critical appraisal involving examination, measurement,
testing, gauging, and comparison of materials or items. An
inspection determines if the material or item is in proper
quantity and condition, and if it conforms to the applicable
or specified requirements. Inspection is generally divided
into three categories: (1) Receiving inspection, (2)
In-process inspection, and (3) Final inspection. In quality
control (which is guided by the principle that "Quality
cannot be inspected into a product") the role of inspection
is to verify and validate the variance data; it does not
involve separating the good from the bad.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
how many cement used in single story residential building per sqft
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
Define relative co-ordinates?
States some of the commonly used commands in cad software’s?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
is concealed wiring a problem in fly ash brick wall?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
undistributed samples are obtained by
Questions related to civil.engg in company
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
how to control PQI (Project Quality Index)