Answer Posted / k.prakashchandra
scott connection
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
sir i have cleared the apti test of EIL held on 15th march and my interview will be in new delhi on 2nd june.i will be very much helpful if u help me regarding the type of interview questions comes at EIL.(URGENT.........PLZZZZZZZZZZ...............)
what are the advantages and disadvantages of speed control of 3 phase induction motor by varying frequency explain with drawing
What is Negative Potential Bias
Is there any type of starter for DC motor other than two point,Three point and Four point starters?
how to set the time in digital timer ?
how withstand of hi-pot test outputs of transformer wire 2.5mm
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
what are the parameters plays a major role in Potential transformer Burden calculation??
can anyone explain 11kV 3core cable megger,hi pot test procedure with connection details?
How Self works in DG set
why we use 630mm single core cable for transformer secondary side and why two neutral cable
i need mat lab program to find out the transmission line losses,regulation and losses
Why is remote backup preferred to local backup?
How to calculate per unit impedance of transformer?
In CTs tan delta point should be earthed , what is the reason behind it?