Can a Differential Pressure Transmitter be used as a normal
pressure transmitter??
Answer Posted / ravi vaya
If the pressure range is low we can use DPT as PT.
| Is This Answer Correct ? | 13 Yes | 4 No |
Post New Answer View All Answers
what is the procedure of belt scale calibration?
how many maximum enter 2mm Dia solid cylindrical pipe into 8mm Dia hollow cylindrical pipe. give answer with calculation.
PT RTD Range: -200 to 500 degree celsius If I configured in DCS Lower range and Upper range . In face plate it shows red colour due to overa range how was the characteristics look If the temperature is more than operating range. how was the characteristics look . whether its in Resistance vs Temperature curve is Linear or Non linear
I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID
what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?
What is stripper & spilitter ? Diffrence in this.?
How to Calibrate Ultrasonic Level Transmitter in field
How we connect a instrument with ground, Give brief explanation with help of diagram?
i have used level transmitter in starch cooking preparation tank. tank total height 2mtr.sometime LT display shows some error value when tank is fully empty and diaphragm side i already checked okay no problem in diaphragm area. field cable checked 24volt and mA shows correct value while tank empty mA is 4mA. 4mA i needed that 0% but display showing 10% or 15% percentage values are varying continously please give any good solution for me.....
1.can you use SCADA instead of DCS,DCS instead SCADA 2.Difference between DCS and PLC,can their role be reversed i.e. role interchange 3.Difference between RTU and PLC
in differential pressure transmitter,min&max pressure range for hp&lp
can we replace a slot sensor (inductive type) with limit switch (potenial free contact / no-nc type).
Galvanizing.
How to Calibrate Temperature Switch in field
Isometric drawings are generated during _________________ phase of a project