Answer Posted / purnima
First step to verify is the pole with three lights in all
4 directions.
Second step to be verified is wheather the li8ts are in
working condition based on the color required.
Third step to verify the order lights are placed on the pole
fourth step to verify the time difference between each
signal on all sides to be consistent.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the major components of Perf Test Report?
What is the difference between action & script ?
Our software designers use UML for modeling applications. Based on their use cases, we would like to plan a test strategy. Do you agree with this approach or would this mean more effort for the testers.
What is the Myers Boundary Table?
Hi,all i have a desktop App. which have a feature, It's a demo version if u want full version then u have to perches it. Pls give me some idea ASAP how can i break the App.
Is an "A fast database retrieval rate" a testable requirement?
which domain is of high demand for software testing, Right now i am working in Education domain .How about demand for Education domain and which companies are recruiting in education domain
Explain crud testing.
iwant know IEEE formate ,how it is used and exactly where it is used? i have details it follows test plan, testcases...etc. i want real time explanation. pls any one give?
what are the test bugs
What is a code walk through?
Functional and Integration test scenarios for actitime application
hi, this is geetha, i have one doubt regarding the vulnerability testing. For sql injection testing is there any need for the tools to be installed. If it is what is tool and what is the method to test in sql injection testing. Plz Guide me
14.What is function point breakdown?
can anyone tell anyone is providing training for CSTE exam in bangalore? and can u send some links related to this?