Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we choose 400kv,220kv,132kv,66kv,33kv transmission
voltages for transmitting power. Why not other voltage
levels.

Answer Posted / srinivasa rao gampa

Actually the earlier the voltage are generated by assuming
10% voltage drop in transmission.Suppose if you want 100v at
the receiving end assuming 10v drop in transmission 110v are
generated at the sending end.So all these voltages are
multiples of 1.1, Its not bcoz of form factor.But in general
with improved design now a days we may choose any volatge
levels of practical usage.

Is This Answer Correct ?    4 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is ATS & RING MAIN UNIT in Distribution System?And its Function.

1932


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1745


which capacity of RCCB used for five thousand watt electricity load?

1815


how to calculate voltage drop and followed by cable calculation?is there avail in formula?

2004


explain all the classes with example

1905


which IS or IEC is used for earthing,breakdown voltage of transformer oil, hv/pd testing and all type of electrical testing

2557


i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.

1878


what is the effect of earth on capacitance in 3-phase and 1- phase transmission line?

2314


What is the vector group of a transformer,how can it be found out?

2000


what are safety measures in /control in diesal engine/ explain them?

1732


what is plunger and what's the use of it in motor alignment?

2595


hai iam arunkumar. i have applied for an section enginner in rrb. i want lat 5 years solved question papers. if u have please sedn it to arun30682@gmail.com

1771


what is the ms flat constant for calculating earth mat design calculation?

2470


Hi, My plant daily consumption is calculated as 3.8MWH but my supplier has sanctioned an power of 2.6MW per day. how can i equal or distinguish this two factors

1857


How we calculate the size of ht cable for any transformer

2033