Answer Posted / mukarram
I Think there is no Difference between the two.. both are
the same..
Formwork is the term given to either temporary or permanent
moulds into which concrete or similar materials are poured.
In the context of concrete construction, the falsework
supports the shuttering moulds.
and same for shuttering also...
| Is This Answer Correct ? | 12 Yes | 12 No |
Post New Answer View All Answers
What is made from large rocks, which protects the base of cliffs?
what is tension footing?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
How to calculate laplength for 3 floors
what is high type road and low type roads
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
what is diffrence between catchment area,watershed and basin?
How to testing voids of filled aggregate in bitumen mix design
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
How to calculate chejja reinforcement
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
what is the breaking strength of wall tiles
what is shuttering co efficient?