What is the difference between first angle projection and
third angle projection?
Answer Posted / ramkumar
FIRST ANGLE PROJECTION
OBJECT IS INBETWEEN THE VIEWER & PICTURE PLANE
THIRD ANGLE PROJECTION
PICTURE PLANE IS INBETWEEN THE VIEWER & OBJECT
Is This Answer Correct ? | 55 Yes | 6 No |
Post New Answer View All Answers
Reinforcement details at hinged joint
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
give me the rate analysis for Bituminous Macadam and SDBC
Does VDF add strength to the flooring apart from preventing water ingress?
What is the maximum strength of cub compress strength in one cub testing
How to plan a project
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
how to calculate quantity of bricks in circular manhole with examples.
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
What is the tallest man made structure in the world?
How to arrive dry volume of concrete (1.52 to 1.57) ?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required