Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much volume is one bag cement of 50kg

Answer Posted / arun

0.035 cum

for more visit www.arunravi.com

Is This Answer Correct ?    55 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1893


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1759


What difference comes in constructing of house and a housing complex like society

1850


how statics is different from dynamics

1614


what are the layers of the national and heir aprox thickness??

2084


How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm

1448


what is the steel difference between np-2 and np-3 pipes and weight also

2089


strength vs shape factor

2495


What is need for setting limits?

1092


what's the formula for calculate pcc for matt(45mm aggregate)?

2664


Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

2215


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

2394


Why should appointment store person for project ? what is the benefits for company ?

1055


what isload waring calculation

2317


how can we calculate steel value, depending on load

2241