Answer Posted / thiyagan
M20-M means mix proposition and 20 means compressive
strength of concrete at 28 days.
fe415-fe means yield strength of steel 415N/mm2
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
what is the basic difference between Coloumn & Shear Wall
Formula of mid span bar
How did the romans get water up hills using aqua ducts?
how do we design mix ratio?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
how much used soil in 1 brick of standard size?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
Explain the importance of moment of inertia?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
Questions related to civil.engg in company
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
What is the largest concrete dam in the world?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?