Answer Posted / surajit ghosh
Besides all these U also have to main tain all the quality
related papers, like calibration certificates of eqpmts,
checklist of form work, steel, Concrte pour card etc.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Explain what is progress payment?
Define What is aggregate?
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
to minimize budget cost of building , what can i do
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
what is pouring and explain
What is labor and material payment bond?
Why steel rods are produced only in even dimensions?
how to calculate weight of 1.8 cum of aggregate
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
what course did you consider thinking before you enrolled in college?
what is the 0 value in quantity surveying
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
Can we use the flyash bricks in brick bat coba?