Answer Posted / surajit ghosh
Besides all these U also have to main tain all the quality
related papers, like calibration certificates of eqpmts,
checklist of form work, steel, Concrte pour card etc.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
For fine aggregate which is most suitable River sand or crusher sand & why ?
What is the release of lien?
if the nitrates more than 45mg/l in water lead to disease then what is it called
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how can calculate cutting length of diamond ring
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what are the Task work of different labour.?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
what are the ffactors you considered choosing the course?
What are the basic use of runners and standards of pipelines?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
water leak detection system question & answer
1:4:8 pcc calculation 591 cu.ft