Post New Answer View All Answers
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
How can explode a block?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
What are the main reasons for conducting pull-out tests for soil nails?
Define a polyline?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
Moisture content calculation for diff mix ratio's ??
How do you calculate the unit weight of concrete?
what is conrete grade ,how are depent on concrete grad and size of concrete?
how can i calculate cement in brickwork