Answer Posted / himanshu
it is fly-ash based cement and
provides moisture barrier to
main structure from ground
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Can we apply curing compound on ceiling (slab Bottom)
How to calculate brick work quantity?? Block work quantity??
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What are the advantages and disadvantages of using plastic and timber fenders?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
How high should the water tank be to provide a 60 psi at base of this water tower?
load combinations how many types for staad design purpose?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
What are the techniques to measure road difference?
how to do sudoko puzaals?
In cement concrete how to check a quality of material also proportion of material at site ?
How will you reduce the concrete flow after mixing the concrete
Which purpose we use deck anchor in bridges?
How do you measure water flowing through 300mm diameter pipes?