Answer Posted / s.venkatesh naik
the shear key is nothing but provision for increasing the bonding B/W two successive concrete generally old concrete to a new concrete
| Is This Answer Correct ? | 15 Yes | 5 No |
Post New Answer View All Answers
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
density of crush sand & crush stone or grit powder
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
how to do sudoko puzaals?
how to calculate rate analysys of 1:6 plastering 10 sq m
what is the name of shuttering oil used in oman
how much to get of BRC lapping in full yield and half yield ?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
to minimize budget cost of building , what can i do
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork