Answer Posted / s.venkatesh naik
the shear key is nothing but provision for increasing the bonding B/W two successive concrete generally old concrete to a new concrete
| Is This Answer Correct ? | 15 Yes | 5 No |
Post New Answer View All Answers
silt%= silt volume/ silt+sand volume is this right?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
how to remove the quantity of metal 1 and metal 2 in concrete
Explain what is the release of lien?
for pretensioning which will yield first and same for post tensioning?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What is the tensile strength of marble?
what is differences between ferrock and concrete ?
How to calculate the crank rod in slab
how u design STAGING for Superstructure in BRIDGE construction?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
How to do base isolation using ETABS software?
Why steel rods are produced only in even dimensions?