I am constructing a house having 20' X 19' hall.
Do I need to go for a concealed beam. any alternative
please? Thanks if a design is provided.
Answer Posted / arunaadevi
IF you constructing any walls above hall in first floor you
must providing concealed beam. Otherwise don't need for the
concealed beam. you just provide nominal reinforcement
b'cause of the slab will be act as two way slab. You should
provide two slab reinforcement detail.
Thanks
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What are the composition of a landfill?
five requirements of infill panels for walls?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
What is difference between code and standard and specification?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
What is difference between limit state and working stress method? How it is applies in building structure.
silt%= silt volume/ silt+sand volume is this right?
In Rcc ratio calculation I wanted to know quantity of Steel also.
Are cruise ships built for the transatlantic run?
why we use aggregate,sand with cement in concrete?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What are the joints wants to made in masonry where door opening, arches like etc..
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is binding spacing of the rebars at lapping zones.