I am constructing a house having 20' X 19' hall.
Do I need to go for a concealed beam. any alternative
please? Thanks if a design is provided.
Answer Posted / arunaadevi
IF you constructing any walls above hall in first floor you
must providing concealed beam. Otherwise don't need for the
concealed beam. you just provide nominal reinforcement
b'cause of the slab will be act as two way slab. You should
provide two slab reinforcement detail.
Thanks
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what is the calculation of raw material for 0.35cum of m-15
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
Tell me about triple point of water.
Civil engineering related
Questions related to civil.engg in company
How to find beam R/F cutting length
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
What are the main reasons for conducting pull-out tests for soil nails?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
What is the difference between engineering stress and true stress?
What are the advantages and disadvantages of using plastic and timber fenders?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What is the minimum size of the particles of silt soil?
How to calculate unit weight of concrete for m40 grade.