In an Text Box Expected Value is 'icici' where as actual
value came up is 'icci'. Now in the Bug Report How will u
rate the severity and Priority?

Answer Posted / liplong

As per my knowledge if u think in normal case low severity
and low priority.mainly it depends on the situation of the
application or text box.it is a simple spell check error.
but some times this creates a major problem.means
low severity and high priority.

for example if it is icici bank but we are giving icci then
in this case its priority is high

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

difference between change management and configuration management

1571


How a test engineer will convince a test lead when he didn't approve the bug as a report ???

1153


What are the interview question on insurance domain in manual testing

19206


What is bidirectional traceability ??? and how it is implemented

1688


What is build interval period?

1831






What is stub?

683


How do you scope out the size of the testing effort?

1907


What are the typical risks that you identify during test planning and their mitigation plan and Contengency plan.

1996


What is the difference between white box, black box, and gray box testing?

640


What is coverage and what are the different types of coverage techniques?

642


what is date field test case

1446


can any body tell me what is the process of between after getting a documents and testcase writing.

1517


what are the tests u did in entire project? when it did in the project? (means at the release build to end of project) plz explain clearly

1652


How do u prepare test environment for ur application?

1673


What is Catapult Testing in E-Learning Domain?

4656