Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what are the functions of a design engineer

Answer Posted / r.rubeshkumar

The function of a design engineer is not only to use the
CAD software or something to design...
He should analys a structure or a component , he has to
select the material for his design and he should also able
to predict the life for his design....

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which country has the worlds most powerful tank?

1074


what is advantage and disadvantage of forward curve and backward curve blade of an id fan impeller and FD fan impeller??

1633


What is the color of flame if the boiler is running in good condition? How about when it is not in good condition?

2371


What is big advantage of fast breeder reactor ?

1076


What is the meaning of less pumping in AC

1983


How is propeller fitted in shaft?

1902


what is the difference between impact force and sudden force? pls give any example.

2034


what is the function of platern water wall in a boiler? and difference between with ordinary water wall?

2309


Explain what does 0.125 inch stand for in 0.125 inch npt thread?

1073


My vendor filled liquid oxygen in our 11000 liter capacity tank. He filled from 1400 MMWC up to 3200 MMWC. I followed the provided conversion table and found that we had been supplied 1800 MMWC liquid which is going to yield 2815 cubic meter. On the other hand, the vendor claims that he supplied as follows:- 5236 cub mtr(3200 MMWC)-2124 cub mtr(1400MMWC) = 3112 cub mtr. I fear that he wants to charge 297 cubic meters extra. He claims that my method was wrong and his was right. He says that this disparity is because of the conical shape of the base of the flask. I will be thankful if somebody can explain me the truth.

3346


What is a radial-flow turbine?

1189


sir please send previous question papers of technician grade III of all rrb's. thank you

2040


How to Start Boiler Electrical Feed Pump? I mean to How to Charge it?

1877


What are you going to inspect or check when you open the crankcase?

1959


how to prepare welding procedure specification and pqr

5017