Answer Posted / k.prakashchandra
RTU -remote terminal unit ,used in SCADA for receiving and
sending data and to receive commands.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is the effect of vector group while phase sequence of a generator changes,whether the vector group changes or not
what is the standard duration after failure EB power
What is the difference between isolators and electrical circuit breakers? What is bus-bar?
how does commutator convert a.c to d.c?
Why star delta starter is preferred with induction motor?
how calculated Transformer losses.
what is the difference between capacitive and resistive voltage divider?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
why ss stablity limit is more transient stablity limit?
what is the function of gss in the dg set.
what things to be considered when designing UPS
what is gridrotor resistance starter
How will you utilise electrical power? You can start from the generating station.
Diagram on interconnectivity of 11kv transformer with RMU (i.e, one incoming and two outgoing or two incoming and one outgoing)
redundant connection in contactor?