Why LT cables are not sized based on short circuit capacity.
Answer Posted / k.prakashchandra
Cables are not designed for short circuit current as
protection is provided. They can withstand SC currents for
short durations.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What is the emf equation of a transformer?
If a air condition consume 2.50 to 3.00 amp then how much it will consume in watts if it is running 10 hours out of 24 hours????
types of central Air conditioner plant?
Why an ac solenoid valve attract the plunger even though we interchanges the terminal? Will the poles changes?
What is cathode ray oscilloscope (cro)?
State magnitude criterion.
How to use earthing on shipments.
sir i have cleared the apti test of EIL held on 15th march and my interview will be in new delhi on 2nd june.i will be very much helpful if u help me regarding the type of interview questions comes at EIL.(URGENT.........PLZZZZZZZZZZ...............)
On a 6 KVA UPS we have to provide a DC MCB for Battery bank of 16 nos (12 V 42 AH). What Shall be the current rating of DC MCB ?
in a solar power plant,we are going to step up the voltage 350V to 33kv, and to 132kv GSS. i want to ask that if it is possible that 315v/33kv is not possible because we also use 315v/11kv. or it should be 415v/33kv? is it effects generation or losses? the second question is-generation is depends on LV winding? or LV winding design for generation voltage?
what are the differant std sizes of cable trenches?
how i calculate the syncrones generator NGR resistance .if we have a 6mw generator line voltage of generator 11kv also line current 393.3 ampere.
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
What is the classification of hydro projects based on installed capacity?
How is the gain affected by the introduction of feedback in a control system.