Answer Posted / sree
L.T: UPTO 440V
H.T :11KV , 2.2KV,3.3KV,6.6KV
E.H.T:33KV,66KV,110KV,400KV
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.
what is the difference between surge protection capacitor and surge arrestor
how to calculate short circuit current for the busbar
WHAT IS DOL STARTER? HOW IT WORK? GIVE ITS CONTROL AND POWER DIAGRAM .
What is domestic transformer? Draw the connection of domestic transformer.
why we testing the core balance of the transformer before comissioning?
11 kV line deraction check by an Engineer.
What is the classification of hydro projects based on installed capacity?
What are the electrical engineer roles and responsibilities in chemical plant?
difine electrical ballast in HPSVL
what is the relation between knowing of the distance between power transformer and the capacitor feeder in case of parallel operation
Should power factor be low or high?
what is differant beetween overload current and phase current?
Hi Suppose we have a wye/wye transformer which is grounded at both sides,in this situation, do we have ay ground transformer? in other words, ground transformer can do any thing more (while we have nuetral wire in both sides)? As the last question, what about 3rd harmonic? we have two choices: first using wye/delta transformer + ground transformer and second using wye/wye earthed connection.in the former choice, we dont have 3rd harmoonic at the secondary side but what about Yn/yn conection? do we suffer from 3rd harmonic in the Yn/yn connection?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.