difference between limit state method and working stress in
terms of load
Answer Posted / karthick.k
In case of design procedure , the facted load can be taken
for limit state mtd, by working stress method axial load
can be taken and strength of material is low, by limit
state method strength of material is high.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
.5Ast
in one SQM plaster how much Cement and sand consumed in ratio 1:4
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
How to find permissible diagonal tensile stress in reinforced brick work
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
what is smart building materials?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is an ortho mode?
What is passive earth pressure ?
Define What is passive earth pressure ?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How to find out kg per Sft ?