why in US MAINTAIN 60hz,110volts when compared with
50hz,220v in india
Answer Posted / pkg
also they work on low rpm
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
While testing a ZCT what parameters have to check or measure?
what is the function of choke in the flourcent tube lights and why the colour is in white mostly in flourcent tube lights
why high speed tripping relay will be used in tripping circuit why not normal relay
What is mean by hot and cold loop testing?
Explain about Leakage Test.
why do you add the load short circuit impedance when considering short circuit amperage. It seems that you should only consider supply. If you need to consider loads and you don't know what loads are to be added , what would be a good sub-transient reactance rating for the loads?
What will be the impact on motor performance if a LT motor is rewound with changed motor winding data as given below:- Original winding data: total 04 wires = 02 wires of 17 SWG + 02 wires of 16.5 SWG. Changed Winding data: total 03 wires of 15.5 SWG wire size Motor rating: 160KW, 740RPM, 415V, ID FAN application. Normal Running Current = 95% of FL Current.
can you please send me the technical questions and aptitude questions of honeywell and jindal steel electrical engg. question paper my e-mail ID is(kkesavanraj@gmail.com)
if grounding is notdone at regular intervals for long distance transmission, will the load connected at distribution end receive voltage during negativehalf cycle of the sine wave?
Can you please explain creepage distance in detail, for a 6.6kV cable head what must the distance be and how do you determine it?
As we know induction squirrel cage motor torque Directly praprortinal to applied voltage in star connection & delta also. If I connect 55KW Motor to DOL starter in load condition does motor withstand the load & what will be the current withdrawn ? motor will not fail ?
A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.
explain supply side and demand side energy management with advantages & disadvantages
what is apparent poewr, reactive power, & active power?
What types domain of laplace transforms? What behavior can laplace transform predict how the system work?