Answer Posted / mukesh
i dont no. so please give me perfect answer on my email.
urgent.
thanks.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.
How to calculate approximate load loss of a distribution transformer by knowing %ge imp of transformer?
How cmd is calculated in case of energy neters
what are the advantage and dis-advantage of 3 phase 4 wire energy meter?
What are the various kind of cables used for transmission?
What is contract demand in solar system?
WHAT IS THE MEANING OF BALANCED / UNBALANCED IN STABILIZER TYPES.
pls tell us AC plant are how do work and parts name with picture
Why open circuit test of transformers is conducted at rated voltage??Why not any other voltage??
How to calculate no of EARTH PIT? Describe the formula as per IS standard?
why Lightening Arrester Probe sharp at Top of telecom tower.
what kinds of Transformer oil grade is better for power transformer ?
Ratings of power transformer,Distribution transformer.
what is mean by kneepoint voltage? when it will happen? ( my doubt is, if CT secondary is open means ct get saturation or blas? what are factors are required for calculations? plz give currect anws:
Why do we apply both Differential and REF (HV and LV) protection schemes on YNyn configuration of a transformer?