Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What do you mean by linear and bilateral network?

Answer Posted / rajneesh

in bilateral the vltge crnt relation is samefor either
direction. in case f unilateral the two will have diff.
relation for diff. direction

Is This Answer Correct ?    4 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is meant by LCR meter? where its useful ?

2000


Can we use BS 6651 and BS EN 62305 standards for computer room lightning ptotection in substation?

2192


What is the Load Capacity of Panther conductor (0.2) and dog conductor (0.2) 

2769


Diagram and details of polarity test for Current Transformer 11kv 400/200/100/1A

2978


what is the difference between rectifier and converter and commudator?

1889


how to calculate fault level?

2211


why they were using TRIAC instead relay in some controllers and what is the advantages.

1966


where solid grounding and where grounding through ngr done and why?

2515


why surge protectetor work explain with the help of circut diagram?

1940


for a 500 KVA connected load, I calculated 30% of capactor for power correction. Even after using 225 KVR capactor PF is not improving. What could be reason for low Phase correction factor?

1912


what is kvarh? Please define it With calculation General motors ?

1100


What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.

2026


What is the Temperature to be set in Thermostat provided in Marshalling box of the Transformer / Motor.

2968


3phase motor can be used as a Prime mover for alternator.

1540


how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.

2152