Answer Posted / reshmi
stripping is the process of removing the formswork from the
cured conctere structure . usuallly its is done after 14
days after curing.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is portland cement
Coverage of 25mm.thick ratio of 1:4 cement mortar?
natucher of concrete &type of concrete?
What is the release of lien?
What is the tensile strength of marble?
The portion of a brick cut across the width is called?
what is the most suitable foundation when construct a bird watching tower in a marshy land
whaat is blister in box girder bridge and what is its function..
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
Why the statue of liberty is made of copper?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.