four jobs j1,j2,j3 and j4 are waiting to be run. Their
expected runtimes are 9,6,3 and 5 respectively. In order to
minimize average response time, the jobs should be run in
the order:
a) j1j2j3j4
b)j4j3j2j1
c)j3j4j1j2
d)j3j4j2j1
Answer Posted / dipali
j3j4j2j1
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
I want to join for load runner training..please suggest me which is the best institute for load runner training in bangalore?
send me e-mail on dell tech question papers 2011 -2012
why unix commands simpler rather than complex task
can i knw what are we supposed to read for the coming oces/dgfs 2009 exam?what kind of book are we supposed to study?
could u please tell me where the click view tool coaching in hyderabad
how to delete four out of five duplicate records in a table using sql
i want to know ,If a five-digit number is input through the keyboard, write a program to calculate the sum of its digits.
could i know the selection pattern at hpcl, am an undergradute in chemical technology, but my sujects or course do not figure out antwhere on the lists.
How EVA granules manufactured (I wanted to know the manufacturing process). (Virgin Granules) and what are the Raw Materials used.
What is the use of SUN Server
What is HPLC ? and define it.
what is the difference a zero argument constructor and a default constructor?
How to calculte strengh of scaffoling(indian)
What is the purpose of dampening roller
what is the program to find out the smallest word in a sentence? like if the sentence is : this is my room. then out put will be : is