Answer Posted / lokanatha reddy.r
an extra length of bar should be provided for interchanging
the stresses from steel to concrete and vice versa is
called ond strength of concrete
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
WHAT DLC DESIGN IN CONSTRUCTION
what is hydrostatic paradox?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
dialation means
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
what is Short bored pile foundation.
What is the difference between Hinged and pinned in Column ends
what is that one cub metre plaster in cemant and fine sand
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
Use of coping on terrace wall and in 4" wall is compulsory or not ?
In reclamation works what are the importance of geotextiles and sand?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com