Answer Posted / lokanatha reddy.r
7850kg/m3
| Is This Answer Correct ? | 34 Yes | 2 No |
Post New Answer View All Answers
Why are separation membranes used between concrete pavement slab and sub-base?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What in bending moment, if a moment is free end of cantilever beam?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
What are the responsibilities of a site manager?
how statics is different from dynamics
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
what is the criteria for the finalisation of pavement thickness in road project?
how to calculate the weight of concrete
how much of the strength comes from post-production curing
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you