how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / vasanth
Skilled labour 1.5 m3, Un skilled .7m3
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
how much quantity of cement,sand and water required for 1 sq feet flooring work .
from where ican get sample papers for CET-delhi 2012
Rate analysis of Vitrified tile in cement mortor 1:3
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
how can we calculate steel value, depending on load
Can inverted beams used in pipes during construction?
Define absolute co-ordinates?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
Define What happens to Load at yielding ?
Form where IS456 is adopted in 1978?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?