how much quantity a skilled labour and unskilled does Pcc
per day, if ratio is(1:2:4)
Answer Posted / vasanth
Skilled labour 1.5 m3, Un skilled .7m3
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
What is the Null Point of chimney in Power Plant
what is the use of water bar in water tank and is this an extra item in estimate?
what is idealized curve for concrere and steel
What are the methods of measurement? Describe it shortly
What are the RISKS during the project construction?
What are the basic use of runners and standards of pipelines?
In which code the the maximum height of concrete casting has been explained
What are segregation and bleeding?
how much area can be platered by a mason for exterior
Why is the statue of liberty made of copper?
Explain what is progress payment?
2. What are the advantages of your present job, things you like about it?
if the nitrates more than 45mg/l in water lead to disease then what is it called
indian standard split spoon sampler