Answer Posted / praveen
it's the part of the structure, which rests above the
plinth level
| Is This Answer Correct ? | 17 Yes | 13 No |
Post New Answer View All Answers
why is M30 grade Concrete use for Foothing & Column M50
What is rolling stock
What Are The Different Type Of Slump Test Indications?
How do you compute the volume of airflow?
I want to join bhel because
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Define What is unit weight of normal concrete?
how to calculate the length diamond shaped striupps in column
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
Would you cause a 55-gallon drum of water to weigh more by climbing in?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
what is the permanent solution applied for restoration of leaning tower of pisa?