Answer Posted / ravi bhatia
49 x d for M-25 concrete mix
57 x d for M-20 concrete mix
| Is This Answer Correct ? | 4 Yes | 12 No |
Post New Answer View All Answers
what is stressing
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
Explain different types of rcc pipes.
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
how much shouid be the rate for ready mix concrete per cubic meter
In earth work 1300 cum soil how to calculate how many liters require in water
Define absolute co-ordinates?
What is the minimum size of the particles of silt soil?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
how to calculate the concrete mix m30 by volume
afe or not
what is the minimum compressive strength of clay brick
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need