What is a roll of adopter panel in terms of h.t. Panel ???
Answer Posted / k.prakashchandra
When the new additional panel does not the match the
existing ones and can not be fitted, adopter panel is used
as an in -between panel.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to use computer cpu ups use for home inverter circuit board
How we calculate the size of ht cable for any transformer
why do we have spikes enough to burn electronic boards, when generators are not grounded
1) why a dg set shows variation of power factor and load when synchronised with other dgs? 2)Why the load sharing is not become equal in all dgs?. 3)When a dg set will not run on auto start?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
What is the difference between PLC and Embeded system
How will you justify IR value and Charging voltage of any motor,transformer and Cables.......???? . . . . . . . . Plz tell me any body Baljeet Singh, engineer_89@refiff.com
please send me RRB electrical engineer previous year questions for Sr. Section Engineer
sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.
how to calculate maximum current
what is the efficiency of thyristor
why power not passes in plastic and rubber material
How generator NPS(NEGATIVE PHASE SEQUENCE TEST)TEST WAS DONE? PROCEDURE WITH DETAILS?
How we can determine short circuiting current any plant and for example a plant which power generation is 415 volts and plant load is 500 kw.
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?